Diecastmates, diecast model database | stash manager
login | faq | facts | about us | privacy | advertise |
diecast model database | stash manager
Login 
ssn-modellbau
Switch to SCM
Sven Schönyan (ssn-modellbau)
DE
Offline

 

Upper Levels

View images (5): | | List

There are some more guys building very promising ship models I got a lot of inspiration from watching their progress the last few weeks.
As I want to clean up my workbench in preparation for a much bigger project hopefully starting in summer I found the mood to go on with my build of HMS Indefatigable.
I´m still looking at the very good details pictures in my reference books for adding more details to the supertructure vertical surfaces. But at on point I have to go on assembling and building up the upper deck levels. Before I could do that I had to paint the inner walls of the forward and aft superstructure. Next step was to glue some of the secondary guns into position and attach the next deck level onto it.
Then I could assemble the tripod forward mast and attach its plattforms. The brige level is supported by some vertical bars. The provided PE parts didn´t satisfy me and I build them from Evergreen with bracing from 0,1mm wire.
I simulated the clamps on the middle superstructure by gluing very little pieces of Evergreen on the sides.

 

Project

This album is attached to project HMS Indefatigable.

Albums: 8 with 50 images
1:350
On hold
1:350 HMS Indefatigable (Combrig 3531FH/WL)
 

Comments

10. February 2015 at 20:55:12 Share

All albums

Return to the overview page to View all albums

 

© 2010-2020 diecastmates | about us | privacy | advertise | links

We use cookies to give you a great and free experience on our website. By continuing to browse the site you are agreeing to our use of cookies.

You can change your Cookie settings at any time. (Essential cookies are for: preferences, security, performance analytics and contextual advertising)

Privacy policy »     Continue